F19: Tower Defense in Space
Contents
ABSTRACT
My abstract goes here.
INTRODUCTION AND OBJECTIVES
RC CAR OBJECTIVES | ||||
---|---|---|---|---|
|
TEAM OBJECTIVES | ||||
---|---|---|---|---|
|
CORE MODULES OF TOWER DEFENSE | ||||
---|---|---|---|---|
|
PROJECT MANAGEMENT ADMINISTRATION ROLES | ||||
---|---|---|---|---|
|
TEAM MEMBERS & RESPONSIBILITIES | ||||
---|---|---|---|---|
Team Members |
Administrative Roles |
Technical Roles | ||
|
|
| ||
|
| |||
|
|
| ||
|
|
SCHEDULE
TEAM MEETING DATES & DELIVERABLES | ||||
---|---|---|---|---|
Week# |
Date Assigned |
Deliverables |
Status | |
1 | 10/15/19 |
|
| |
2 | 10/22/19 |
|
| |
3 | 10/29/19 |
|
| |
4 | 11/5/19 |
|
| |
5 | 11/12/19 |
|
| |
6 | 11/19/19 |
|
| |
7 | 11/26/19 |
|
| |
8 | 12/3/19 |
|
| |
9 | 12/10/19 |
|
|
BILL OF MATERIALS (GENERAL PARTS)
MICRO-CONTROLLERS | ||||
---|---|---|---|---|
PART NAME |
PART MODEL & SOURCE |
QUANTITY |
COST PER UNIT (USD) | |
|
|
|
HARDWARE INTEGRATION PCB
Hardware Design
The hardware integration PCB was designed with two goals:
1. Minimize the footprint of the onboard electronics
2. Minimize the chances of wires disconnecting, during drives
To accomplish these goals,
The board consisted of n layers:
layer name
Technical Challenges
Design
- Balancing priorities between HW design and getting a working prototype
Assembly
- Wireless antenna connector on master board not accounted for in footprint, it may have to be removed to avoid interference with one connector.
Bill Of Materials
HARDWARE INTEGRATION PCB | ||||
---|---|---|---|---|
PART NAME |
PART MODEL |
QUANTITY |
COST PER UNIT (USD) | |
TEST
In order
Hardware Design
During
We used
CONCLUSION
This pr
Project Video
Project Source Code
Advice for Future Students
- FORM YOUR TEAM AS EARLY AS POSSIBLE AND START WORKING ON THE PROJECT AS EARLY AS POSSIBLE (WEEK 1 IF POSSIBLE)
- If you are