S21: exFAT

From Embedded Systems Learning Academy
Revision as of 09:24, 8 March 2021 by Proj user11 (talk | contribs)

Jump to: navigation, search

Project Title

exFAT project title here.



Abstract

Add a few sentence abstract here.

Introduction

The project was divided into N modules:

  • Sensor ...
  • Motor..
  • ...
  • Android

Team Members & Responsibilities

<Team Picture>

Gitlab Project Link - [1]

<Provide ECU names and members responsible> <One member may participate in more than one ECU>

  • Sensor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Motor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Geographical
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Communication Bridge Controller & LCD
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Android Application
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Testing Team
    • Link to Gitlab user1
    • Link to Gitlab user2


Schedule

Week# Start Date End Date Task Status
1
  • 02/28/2021
  • 02/28/2021
  • 02/28/2021
  • 02/28/2021
  • 03/07/2021
  • 03/07/2021
  • 03/07/2021
  • 03/07/2021
  • Read previous projects, and form a summary regarding the requirements of project.
  • Setup the Gitlab repo for the project.
  • Establish team roles for each group member.
  • Begin research for selecting hardware components.
  • Completed
  • Completed
  • Completed
  • Completed
2
  • 3/07/2021
  • 3/07/2021
  • 3/07/2021
  • 3/07/2021
  • 3/07/2021
  • 3/07/2021
  • 3/07/2021
  • 3/10/2021
  • 3/14/2021
  • 3/14/2021
  • 3/14/2021
  • 3/14/2021
  • Document issues from previous semesters' reports, such that pre-emptive actions may be taken.
  • Meet on 3/10/2021 to discuss final parts to be ordered.
  • Schedule an additional meeting in the middle of the week for regular check-ups and important discussions.
  • Schedule team meetings for each controller group for specifics to be discussed.
  • Create branches for each controller group.
  • Begin work with integration within each controller group.
  • Completed
  • In Progress
  • In Progress
  • In Progress
  • In Progress
  • In Progress


Parts List & Cost

Item# Part Desciption Vendor Qty Cost
1
2


Printed Circuit Board

<Picture and information, including links to your PCB>



CAN Communication

<Talk about your message IDs or communication strategy, such as periodic transmission, MIA management etc.>

Hardware Design

<Show your CAN bus hardware design>

DBC File

<Gitlab link to your DBC file> <You can optionally use an inline image>




Sensor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Motor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Geographical Controller

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>





Communication Bridge Controller & LCD

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Master Module

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Mobile Application

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>






Conclusion

<Organized summary of the project>

<What did you learn?>

Project Video

Project Source Code

Advise for Future Students

<Bullet points and discussion>

Acknowledgement

References