Difference between revisions of "S23: X Æ A-13"

From Embedded Systems Learning Academy
Jump to: navigation, search
(Schedule)
(Schedule)
Line 74: Line 74:
 
|-
 
|-
 
! scope="row"| 2
 
! scope="row"| 2
| 02/20/2023
+
| 02/19/2023
 
| 02/22/2023
 
| 02/22/2023
 
|
 
|
Line 91: Line 91:
 
|-
 
|-
 
! scope="row"| 4
 
! scope="row"| 4
| 03/10/2023
+
| 03/11/2023
 
| 03/17/2023
 
| 03/17/2023
 
|
 
|
Line 97: Line 97:
 
* <font color = "green">Finalize the sensors and other hardware we need for the project.
 
* <font color = "green">Finalize the sensors and other hardware we need for the project.
 
* <font color = "green">Finalize the best available hardware based on the data collected.
 
* <font color = "green">Finalize the best available hardware based on the data collected.
* <font color = "green">To validate communication between CAN nodes and PCAN data.
+
* <font color = "green">To validate communication between CAN nodes via BUSMASTER.
 
| <font color = "green">Completed
 
| <font color = "green">Completed
 
|Team
 
|Team
 
|-
 
|-
 
! scope="row"| 5
 
! scope="row"| 5
 +
| 03/18/2023
 +
| 03/21/2023
 +
|
 +
* <font color = "green">Work on the RC Car Infrastructure Lab
 +
* <font color = "green">Finalize and procure the ultrasonic sensors
 +
* <font color = "green">Interface and validate the ultrasonic sensors for sensor node
 +
* <font color = "green">Set up the driver node and build the ecosystem for receiving/transmitting CAN messages
 +
* <font color = "green">Develop a base obstacle avoidance logic
 +
* <font color = "green">Set up the motor node and create a fake indication for left,right turns and forward,backward movement to motor
 +
| <font color = "green">Completed
 +
|Team
 +
|-
 +
! scope="row"| 6
 
| 03/28/2023
 
| 03/28/2023
 
| 04/03/2023
 
| 04/03/2023
Line 108: Line 121:
 
| Ongoing
 
| Ongoing
 
|-
 
|-
! scope="row"| 6
+
! scope="row"| 7
 
| 04/03/2023
 
| 04/03/2023
 
| 04/10/2023
 
| 04/10/2023
Line 116: Line 129:
 
| TBD
 
| TBD
 
|-
 
|-
! scope="row"| 7
+
! scope="row"| 8
 
| 04/03/2023
 
| 04/03/2023
 
| 04/10/2023
 
| 04/10/2023
Line 125: Line 138:
 
| TBD
 
| TBD
 
|-
 
|-
! scope="row"| 8
+
! scope="row"| 9
 
| 04/11/2023
 
| 04/11/2023
 
| 04/18/2023
 
| 04/18/2023
Line 134: Line 147:
 
| TBD
 
| TBD
 
|-
 
|-
! scope="row"| 9
+
! scope="row"| 10
 
| 04/11/2023
 
| 04/11/2023
 
| 04/18/2023
 
| 04/18/2023
Line 143: Line 156:
 
| TBD
 
| TBD
 
|-
 
|-
! scope="row"| 10
+
! scope="row"|
 
| 04/11/2023
 
| 04/11/2023
 
| 04/18/2023
 
| 04/18/2023

Revision as of 17:15, 5 April 2023

Project Title

<Team Name>



Abstract

<2-3 sentence abstract>

Introduction

The project was divided into N modules:

  • Sensor ...
  • Motor..
  • ...
  • Android

Team Members & Responsibilities

<Team Picture>

Gitlab Project Link - [1]

<Provide ECU names and members responsible> <One member may participate in more than one ECU>

  • Sensor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Motor
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Geographical
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Communication Bridge Controller & LCD
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Android Application
    • Link to Gitlab user1
    • Link to Gitlab user2
  • Testing Team
    • Link to Gitlab user1
    • Link to Gitlab user2


Schedule

Task# Start Date End Date Task Status Point of Contact
1 02/13/2023 02/18/2023
  • Read previous years' projects, gather information, and discuss among the team members.
  • Create a private git fork for the RC car repository.
  • Decide and conclude a recurring team meeting schedule
Completed Team
2 02/19/2023 02/22/2023
  • Order CAN transceiver modules
Completed Iftiza
3 03/03/2023 03/10/2023
  • Research several RC Car for the target application
  • Purchase RC Car
Completed Sharan, Prabhat, Tushara
4 03/11/2023 03/17/2023
  • Create a git flow process. Establish a process for merging into the master code repository.
  • Finalize the sensors and other hardware we need for the project.
  • Finalize the best available hardware based on the data collected.
  • To validate communication between CAN nodes via BUSMASTER.
Completed Team
5 03/18/2023 03/21/2023
  • Work on the RC Car Infrastructure Lab
  • Finalize and procure the ultrasonic sensors
  • Interface and validate the ultrasonic sensors for sensor node
  • Set up the driver node and build the ecosystem for receiving/transmitting CAN messages
  • Develop a base obstacle avoidance logic
  • Set up the motor node and create a fake indication for left,right turns and forward,backward movement to motor
Completed Team
6 03/28/2023 04/03/2023
  • Design Geo Controller module
Ongoing
7 04/03/2023 04/10/2023
  • Create a custom DBC file
  • Design the modularity of each nodes
TBD
8 04/03/2023 04/10/2023
  • Decision on the app development platform
  • Decide on Flutter vs Android Studio
  • Learn the fundamentals of Android app development
TBD
9 04/11/2023 04/18/2023
  • Decide WiFi or Bluetooth for primary connectivity
  • Establish a base code platform for the communication module
  • Develop the car data display page for the mobile application.
TBD
10 04/11/2023 04/18/2023
  • Design of compass module
  • Practical validation of the GPS lab parser
  • Engage in compass calibration and integrate data with other CAN modules.
TBD
04/11/2023 04/18/2023
  • Decoding the ESC logic of the car
  • Formulating the motor logic
  • Design and test the HMI and LCD module
TBD
11 04/19/2023 04/26/2023
  • Integration testing with obstacle avoidance algorithm
  • Start examining the results of practical trials conducted in the past week's execution and make necessary adjustments to address encountered problems.
  • Verify the accuracy of the Direction Distance Calculation Module through unit testing, ensuring that the module output matches the manual calculation of data.
  • Design and build the PCB for the present prototype
TBD


Parts List & Cost

Item# Part Desciption Vendor Qty Cost
1 RC Car Maverick Quantum MT [2] 1 $180.00
2 RC Car Battery Lithium Polymer Two-Cell 1 $20.0
3 CAN Transceiver Modules SN65HVD230 4 $43.56
4 Microcontroller Development Environment SJTwo Board 5 $250


Printed Circuit Board

<Picture and information, including links to your PCB>



CAN Communication

<Talk about your message IDs or communication strategy, such as periodic transmission, MIA management etc.>

Hardware Design

<Show your CAN bus hardware design>

DBC File

<Gitlab link to your DBC file> <You can optionally use an inline image>




Sensor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Motor ECU

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Geographical Controller

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>





Communication Bridge Controller & LCD

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Master Module

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>



Mobile Application

<Picture and link to Gitlab>

Hardware Design

Software Design

<List the code modules that are being called periodically.>

Technical Challenges

< List of problems and their detailed resolutions>






Conclusion

<Organized summary of the project>

<What did you learn?>

Project Video

Project Source Code

Advise for Future Students

<Bullet points and discussion>

Acknowledgement

=== References ===