Line 35: Line 35:
 
|-
 
|-
 
! scope="col"| Week#
 
! scope="col"| Week#
! scope="col"| Date
+
! scope="col"| Start Date
 +
! scope="col"| End Date
 
! scope="col"| Task
 
! scope="col"| Task
! scope="col"| Actual
+
! scope="col"| Status
 +
! scope="col"| Actual Completion Date
 
|-
 
|-
 
! scope="row"| 1
 
! scope="row"| 1
 
| 3/19
 
| 3/19
 +
| 3/21
 
| Finalized Schedule and materials
 
| Finalized Schedule and materials
 
| Completed
 
| Completed
 +
| 3/21
 
|-
 
|-
 
! scope="row"| 2
 
! scope="row"| 2
| 3/26
+
| 3/22
 +
| 3/28
 
| Test water pump, timer, and heater
 
| Test water pump, timer, and heater
| In process
+
| Completed
 +
| 3/28
 
|-
 
|-
 
! scope="row"| 3
 
! scope="row"| 3
| 4/2
+
| 3/29
 +
| 4/4
 
| Design Schematics & build up prototype
 
| Design Schematics & build up prototype
| Plan
+
| Completed
 +
| 4/4
 
|-
 
|-
 
! scope="row"| 4
 
! scope="row"| 4
| 4/9
+
| 4/5
 +
| 4/11
 
| Refine prototype
 
| Refine prototype
| Plan
+
| In process
 +
|
 
|-
 
|-
 
! scope="row"| 5
 
! scope="row"| 5
| 4/16
+
| 4/12
 +
| 4/18
 
| Testing and Debug
 
| Testing and Debug
 
| Plan
 
| Plan
 +
|
 
|-
 
|-
 
! scope="row"| 6
 
! scope="row"| 6
| 4/23
+
| 4/19
 +
| 4/25
 
| Finish project report
 
| Finish project report
 
| Plan
 
| Plan
 +
|
 
|-
 
|-
 
! scope="row"| 7
 
! scope="row"| 7
| 4/30
+
| 4/26
 +
| 5/2
 
| Find project presentation
 
| Find project presentation
 
| Plan
 
| Plan
 +
|
 
|-
 
|-
 
! scope="row"| 8
 
! scope="row"| 8
| 5/7
+
| 5/3
 +
| End
 
| Ready for Demo
 
| Ready for Demo
 
| Plan
 
| Plan
 +
|
 
|}
 
|}
  

Revision as of 05:18, 11 April 2017

Grading Criteria

  • How well is Software & Hardware Design described?
  • How well can this report be used to reproduce this project?
  • Code Quality
  • Overall Report Quality:
    • Software Block Diagrams
    • Hardware Block Diagrams
      Schematic Quality
    • Quality of technical challenges and solutions adopted.

Project Title

Wake up Barista

Abstract

When you have studied all night and need to attend a meeting in 9:00am next morning, you are running out of time to get anything done but have to get your caffeine fixed. Is there anything better than wake up with coffee aroma fills the air surrounding you? We want to introduce our product, your personal Wake Up Barista. A smart coffee maker embedded with alarm clock. Brewing the coffee for you right away when you leave your bed! This device will heating and brewing the coffee automatically when the alarm clock begins to vibrate and ring. Enjoy the hot and fresh coffee when you just open your eyes, also take a deep breath with the tempting smell, you will love it for sure!

Objectives & Introduction

Show list of your objectives. This section includes the high level details of your project. You can write about the various sensors or peripherals you used to get your project completed.

Team Members & Responsibilities

  • Chien Wei Lan
  • Mingyang Wang
  • Lin Zheng
  • Zhixuan Zhou

Schedule

Show a simple table or figures that show your scheduled as planned before you started working on the project. Then in another table column, write down the actual schedule so that readers can see the planned vs. actual goals. The point of the schedule is for readers to assess how to pace themselves if they are doing a similar project.

Week# Start Date End Date Task Status Actual Completion Date
1 3/19 3/21 Finalized Schedule and materials Completed 3/21
2 3/22 3/28 Test water pump, timer, and heater Completed 3/28
3 3/29 4/4 Design Schematics & build up prototype Completed 4/4
4 4/5 4/11 Refine prototype In process
5 4/12 4/18 Testing and Debug Plan
6 4/19 4/25 Finish project report Plan
7 4/26 5/2 Find project presentation Plan
8 5/3 End Ready for Demo Plan

Parts List & Cost

Number Part Name Cost
1 Heater N/A
2 Water pump N/A
3 LCD Module N/A
4 Speaker N/A
5 vibrator N/A

Design & Implementation

The design section can go over your hardware and software design. Organize this section using sub-sections that go over your design and implementation.

Hardware Design

Discuss your hardware design here. Show detailed schematics, and the interface here.

Hardware Interface

In this section, you can describe how your hardware communicates, such as which BUSes used. You can discuss your driver implementation here, such that the Software Design section is isolated to talk about high level workings rather than inner working of your project.

Software Design

Show your software design. For example, if you are designing an MP3 Player, show the tasks that you are using, and what they are doing at a high level. Do not show the details of the code. For example, do not show exact code, but you may show psuedocode and fragments of code. Keep in mind that you are showing DESIGN of your software, not the inner workings of it.

Implementation

This section includes implementation, but again, not the details, just the high level. For example, you can list the steps it takes to communicate over a sensor, or the steps needed to write a page of memory onto SPI Flash. You can include sub-sections for each of your component implementation.

Testing & Technical Challenges

  • 1. Control the heater and water pump.
  • 2. Work on RTC timer on SJ one Board.
  • 3. Control the speaker and vibrator as alarm clock.
  • 4. Display the clock time with LCD module


My Issue #1

Discuss the issue and resolution.

Conclusion

Conclude your project here. You can recap your testing and problems. You should address the "so what" part here to indicate what you ultimately learnt from this project. How has this project increased your knowledge?

Project Video

Upload a video of your project and post the link here.

Project Source Code

References

Acknowledgement

Any acknowledgement that you may wish to provide can be included here.

References Used

List any references used in project.

Appendix

You can list the references you used.